Sizing the Power Budget for a Multi-Hour Robot Mission
Tom Cosgrove,

TL;DR: A realistic robot power budget mission runtime calculation sums four load groups (drive, compute, sensors, connectivity), accounts for auxiliary loads, adds a safety margin of 20-30%, and compares usable battery energy with the total average power. For a 6-hour inspection mission on a mid-size UGV drawing approximately 55 W average, you need at least 396 Wh of usable energy including a 20% planning margin. Temperature below 0 °C can substantially reduce Li-ion capacity, and rough terrain can double drive power. Add sensors only after checking how many minutes each one costs you.
Why the robot power budget mission runtime calculation decides whether your mission finishes
Field robotics teams routinely underestimate energy demand. A rover that runs 8 hours on a bench in a lab often returns after 4 hours in the field, with a discharged pack and half the waypoints unvisited. The gap comes from three sources: incomplete accounting of continuous loads, ignoring peak-versus-average draw, and treating nameplate battery capacity as usable capacity.
The robot power budget mission runtime calculation is the engineering discipline that closes that gap. It is not a spreadsheet formality. It determines whether you can run a 6-hour pipeline inspection, whether adding a thermal camera forces a mid-mission swap, and whether you need a larger pack or a smaller compute stack. This guide walks through the method Fictionlab’s team uses when scoping missions for Raph Rover and Leo Rover deployments, with a worked 6-hour example, a sensor cost table, and notes on temperature and terrain derating.
What goes into a mobile robot power budget
Before running numbers, you need to identify every continuous and intermittent consumer on the platform. For a typical UGV, group loads into five categories.
- Drive (motors and drivers): the largest and most variable load. Depends on mass, terrain, speed, and slope.
- Compute: onboard computer running ROS 2, plus any GPU or accelerator for perception.
- Sensors: LiDAR, cameras, IMU, GNSS, environmental sensors.
- Connectivity: Wi-Fi, LTE modem, radio link, or mesh node.
- Auxiliary and margin: lights, cooling fans, servos, and a safety reserve.
The formula
The runtime estimate uses one core equation:
Runtime [h] = (E_battery × DoD × η) / ((P_drive_avg + P_compute + P_sensors + P_comm + P_aux) × (1 + margin))
Where:
- E_battery = nominal battery energy in Wh (nominal voltage × Ah).
- DoD = depth of discharge you allow, typically 0.8-0.9 for Li-ion to preserve cycle life.
- η = end-to-end efficiency of DC/DC converters and wiring, typically 0.85-0.92.
- margin = additional safety margin relative to estimated mission energy, typically 0.2-0.3.
How to calculate a 6-hour inspection mission step by step
Consider a mid-size UGV performing a 6-hour outdoor inspection route with autonomous navigation, 2D LiDAR SLAM, and a live video feed to an operator. The following numbers reflect typical values Fictionlab’s team observes on small four-wheel-drive platforms in the 5-10 kg class; treat them as approximate baselines you must verify on your own hardware.
Step 1: estimate drive power
On flat, hard ground at 0.4 m/s, a 6 kg rover with an efficient drivetrain draws roughly 12-18 W average. On grass or gravel, expect 25-35 W. On soft soil or 10° inclines, 40-60 W is realistic. For this example, assume mixed terrain and use 30 W average for drive.
Step 2: add compute
A Raspberry Pi 4 running ROS 2 with navigation and a single camera draws approximately 5-7 W. A Jetson Orin Nano running a perception pipeline draws 10-15 W depending on mode. Use 10 W for a Jetson-class stack.
Step 3: add sensors
Typical continuous loads: RPLiDAR A1 at 2.5 W, Intel RealSense D435 at 2 W, IMU/GNSS combo at 1 W. Total sensors: 5.5 W.
Step 4: add connectivity
Wi-Fi module: 1-2 W. LTE modem streaming H.264 video: 3-5 W. Use 5 W for combined connectivity.
Step 5: sum and apply margin
Total average draw: 30 + 10 + 5.5 + 5 = 50.5 W. Add 10% for auxiliary loads and heating losses: ~55 W.
Required mission energy for 6 hours: 55 W × 6 h = 330 Wh. Apply a 20% safety margin: 396 Wh usable.
Working backward through DoD and efficiency: E_battery = 396 / (0.85 × 0.9) ≈ 517 Wh nominal. A 14.4 V Li-ion pack would need approximately 36 Ah, or a 25.2 V pack around 21 Ah.
How each added sensor shortens runtime
Once the baseline mission is sized, every additional payload eats into the reserve. The following table shows how common sensors reduce runtime on the 517 Wh pack from the example above, holding all other loads constant.
- Baseline (drive + compute + basic sensors + comm, 55 W): 6 h 0 min runtime.
- + Ouster OS0-32 3D LiDAR (~14 W): new total 69 W, runtime drops to approximately 4 h 47 min. Loss: ~73 min.
- + FLIR Boson 320 thermal camera (~1.5 W): total 56.5 W, runtime 5 h 50 min. Loss: ~10 min.
- + Robotic arm idle holding torque (~8 W idle, 25 W active avg): total 63 W (mixed use), runtime 5 h 15 min. Loss: ~45 min.
- + Manipulator gripper + extra servos (~4 W avg): total 59 W, runtime 5 h 35 min. Loss: ~25 min.
- + Second onboard PC for perception (Jetson Orin NX, ~15 W): total 70 W, runtime 4 h 43 min. Loss: ~77 min.
- + Active illumination LEDs (10 W): total 65 W, runtime 5 h 5 min. Loss: ~55 min.
The lesson is direct: a 14 W 3D LiDAR costs you over an hour of mission time on a fixed pack. If that hour matters, you either upsize the battery, downsize the sensor, or reduce another load such as compute duty cycle.
How temperature and terrain change your real runtime
Lab budgets assume 20-25 °C and flat floors. Field missions rarely match either.
Temperature effects on Li-ion packs
Lithium-ion cells lose usable capacity as temperature drops. The exact derating depends on cell chemistry, discharge current, pack design, and cutoff voltage, but published manufacturer discharge curves for many 18650 and 21700 cells show approximate planning ranges of:
- At 25 °C: 100% of rated capacity.
- At 0 °C: approximately 80-90% capacity.
- At -10 °C: approximately 65-80% capacity.
- At -20 °C: approximately 50-70% capacity, with reduced peak current.
Cold also raises internal resistance, which increases voltage sag under motor peaks and can trigger BMS cutoffs before the pack is empty. For sub-zero missions, plan for a derated capacity or use a heated enclosure, which itself consumes 5-15 W.
Terrain effects on drive power
Rolling resistance and slip dominate drive energy. Approximate multipliers on flat-ground drive power:
- Smooth concrete or asphalt: 1.0x baseline.
- Short grass, packed gravel: 1.5-2.0x.
- Loose gravel, sand, mud: 2.0-3.5x.
- Slopes above 10°: add the power needed to gain elevation; for a 6 kg rover at 0.4 m/s, a 10° climb alone requires about 4 W of mechanical power, plus drivetrain losses, rolling resistance, and slip.
A rover budgeted at 30 W drive on a lab floor may pull 60-90 W on a muddy trail. That single factor can halve your runtime independent of any sensor decision. This is why field robotics teams profile drive current on representative terrain before committing to a battery size, and why platforms designed for outdoor inspection missions, such as those used in inspection applications, use conservative drive-power assumptions.
How to measure real loads on your platform
Estimates are a starting point. Before a mission, measure. On a ROS 2 platform you can log battery voltage and current from the firmware or a dedicated INA226 sensor.
A minimal ROS 2 command to record power telemetry from a /battery_state topic (standard sensor_msgs/msg/BatteryState) looks like this:
Record: ros2 bag record -o power_log /battery_state /cmd_vel /odom
Extract average power with a short Python node or post-processing:
- Open the bag with
rosbag2_pyor replay withros2 bag play. - Subscribe to
/battery_state, compute power from voltage and current per sample. Under the standard message convention, discharge current is negative, so battery output power isP = -voltage × current. - Average over the mission window; compare against your budgeted P_total.
- Adjust the margin upward if measured exceeds budgeted by more than 15%.
Run this test on the actual terrain profile of your mission, not on a workshop floor. One 30-minute field run will teach you more than a week of spreadsheet iteration.
FAQ
What depth of discharge should you plan for on a Li-ion pack?
For mission planning, 80-90% DoD is standard. Going deeper accelerates capacity fade and risks cell imbalance. If cycle life matters more than mission length, plan for 70-80% DoD and size the pack accordingly.
How much margin should the robot power budget mission runtime calculation include?
A 20% margin is typical for well-characterized platforms on known terrain. Use 30% or more when the mission environment is uncertain, when sensors have variable duty cycles, or when temperature may drop below 5 °C.
Does regenerative braking meaningfully extend runtime on a small UGV?
Usually not on flat terrain. Many small UGV motor controllers do not return braking energy to the battery, and where regenerative braking is available, recovered energy is often only a few percent of drive energy at low speeds with short braking events. On long downhill segments it can be higher, but you should not rely on it in the base budget.
Should you size the pack for peak current or average current?
Both. Average current sets the energy (Wh) requirement. Peak current sets the pack’s continuous and burst discharge rating (C-rate) and wiring gauge. A pack that meets the Wh requirement but sags under motor stall current will trigger brownouts.
How do you handle intermittent high-power loads such as manipulators?
Estimate their duty cycle. If a 40 W arm operates 25% of the mission, budget 10 W average for it, but verify the pack’s peak current rating covers the full 40 W plus concurrent drive peaks.
Is it better to carry a larger battery or swap packs mid-mission?
That depends on payload capacity, mission logistics, and whether an operator can reach the rover. Larger packs add mass, which raises drive power. Hot-swappable packs add mechanical complexity but keep the rover lighter. For missions above 8 hours, swappable packs are often the practical choice.
How often should you re-measure the power budget?
Any time you change a sensor, update software that affects compute load, or move to a new terrain type. Battery capacity fade varies substantially with cell chemistry, temperature, depth of discharge, charge rate, and calendar age, so re-measure usable capacity every few months on active platforms.